• Ideal for Steel, Glass, Metallurgical Industries, Cement Plants, Refineries, Fertilizer Plants, Thermal Power Stations, etc.
  • Multi-hole / Interchange Thermowell inserts to suit
  • Forced Air Cooling provision
  • High Accuracy, High Stability, Calibration of Multiple Sensors (up to 6) at High Temperatures
  • Range:
    300°C above amb. to 1200°C (to 2190 °F)
  • Accuracy:
    ±3°C and a Resolution of ± 1°C
  • Stability:
    span>Better than ± 0.5°C (up to 600°C)
    ± 1°C (above 600°C)
  • Stabilization Time: 20 minutes
  • Heating Time (to Max.): 60 minutes
  • Cooling Time:
    45 minutes — 1200 to 300°C
    (with forced air cooling)
  • Well Diameter: 45mm
  • Well Depth: 150mm
  • Switch Test Facility / Supply Provided / 5 VDC (open)
  • Traceable Calibration Certificate included